1.26.12 Update:

  1. Construction on the front parking lots is complete.  
  2. Stairways between the upper & lower lots are complete (handrails are installed).
  3. All roofs and HVAC duct work are being replaced (estimated completion: 2.15.12).
  4. Modified design of the additional structure in the front of the building is 12,000 square feet.